Sr.No | Issuing Office | Tender Notice No. | Scope of Work | Estimated Cost(Rs.) | Closing Date & Time for Submission of Tender | Date & Time of Opening of Tender | S.no | LINK | open time | Subm time | View Tender Document | Remark/RFx ID |
1
| EE PROJECT DURG | EE/Project/Dn/Tender No-953 | Tender for engagement of Hiring of 01 No. Pickup Tata-407 for O/o EE (Project) DN CSPDCL DURG | 528000.00 | 07/05/2024 02:00PM | 07/05/2024 03:00PM | 63260 |
| 03:00PM | 02:00PM |
| |
2
| EE PROJECT DURG | EE/Project/Dn/Tender No-952 | Tender for engagement of Hiring of 01 No. JEEP (Category) for O/o E.E. (Project). DN. CSPDCL, DURG | 672000.00 | 07/05/2024 02:00PM | 07/05/2024 03:00PM | 63259 |
| 03:00PM | 02:00PM |
| |
3
| EE PROJECT DURG | EE/Project/Dn/Tender No-951 | Tender for engagement of Hiring of 01 No. JEEP (Category) for O/o E.E. (Project). DN. CSPDCL, DURG | 672000.00 | 07/05/2024 02:00PM | 07/05/2024 03:00PM | 63258 |
| 03:00PM | 02:00PM |
| |
4
| EE(Project)Dn.CSPDCL Kawardha | T-003/24-25 | NIT for Providing 1X63KVA Additional Transformer at Village Bhoytola under Kapadah D/c. | 301108.00 | 06/05/2024 12:00PM | 06/05/2024 12:30PM | 63241 |
| 12:30PM | 12:00PM |
| |
5
| Executive Engineer Project Dn Rajnandgaon | EE/ PROJECT/RJN/T-1598/24 Dt. 15.04.24 | Estimate for Shifting of LT Line for Shri Son Singh Sahu at Village- Nathunawagaon under Tumdibod D/c of (O&M) Dn., Rajnnandgaon,, Estimate for P/s to Shifting of 01 Phase Meter with no. 1008470326 for Sukul Daihan Samiti Prabandhak at Village - Sukul Daihan to Gatapar under Rural D/c of (O&M) Dn., Rajnandgaon & Estimate for P/s to Shifting of 01 Phase Meter with no. 1008470326 for Sukul Daihan Samiti Prabandhak at Village - Sukul Daihan to Gatapar under Rural D/c of (O&M) Dn., Rajnandgaon. | 45556.00 | 05/05/2024 12:30PM | 05/05/2024 01:30PM | 63221 |
| 01:30PM | 12:30PM |
| |
6
| The EE(Project) Dn. Kondagaon | NO./EE/PROJECT/NIT/31/T-8 (2024) KONDAGAON 12.04.2024 | EST. FOR SHIFTING OF 11KV LINE APPLIED BY EE PWD KONDAGAON AT VILLAGE DNK COLONY KONDAGAON UNDER RANDHNA D/C. | 123947.00 | 02/05/2024 03:00PM | 02/05/2024 03:30PM | 63189 |
| 03:30PM | 03:00PM |
| |
7
| The EE(Project) Dn. Kondagaon | NO./EE/PROJECT/NIT/31/T-7 (2024) KONDAGAON 12.04.2024 | ESTIMATE FOR INSTALLATION OF ADDITIONAL XMER OF 25 KVA AT VILL- KORGAON UNDER VISHRAMPURI D/C | 107252.00 | 02/05/2024 03:00PM | 02/05/2024 03:30PM | 63188 |
| 03:30PM | 03:00PM |
| |
8
| The EE(Project) Dn. Kondagaon | NO./EE/PROJECT/NIT/30/T-4 (2024) KONDAGAON 12.04.2024 | EST. FOR ADDITIONAL X-MER 25KVA AT VILLAGE -BIJAPUR POST BIJAPUR BLOCK MAKDI UNDER BIJAPUR D/C. | 99452.00 | 02/05/2024 03:00PM | 02/05/2024 03:30PM | 63187 |
| 03:30PM | 03:00PM |
| |
9
| The EE(Project) Dn. Kondagaon | NO./EE/PROJECT/NIT/30/T-6 (2024) KONDAGAON 12.04.2024 | ESTIMATE FOR INSTALLATION OF ADDITIONAL XMER OF 25 KVA AT VILL- ARANDI UNDER BAHIGAON D/C | 221875.00 | 02/05/2024 03:00PM | 02/05/2024 03:30PM | 63186 |
| 03:30PM | 03:00PM |
| |
10
| The EE(Project) Dn. Kondagaon | NO./EE/PROJECT/NIT/30/T-5 (2024) KONDAGAON 12.04.2024 | ESTIMATE FOR OF ADDITIONAL XMER OF 25 KVA AT VILL- KARANDI POST KARANDI BLOCK MAKDI UNDER BIJAPUR D/C | 192734.00 | 02/05/2024 03:00PM | 02/05/2024 03:30PM | 63185 |
| 03:30PM | 03:00PM |
| |
11
| The EE(Project) Dn. Kondagaon | NO./EE/PROJECT/NIT/29/T-3 (2024) KONDAGAON 12.02.2024 | EST. FOR ADDITIONAL X-MER 25 KVA AT VILLAGE -AMRAVATI POST AMRAWARI BLOCK MAKADI UNDER BIJAPUR D/C. | 172003.00 | 02/05/2024 03:00PM | 02/05/2024 03:30PM | 63183 |
| 03:30PM | 03:00PM |
| |
12
| The EE(Project) Dn. Kondagaon | NO./EE/PROJECT/NIT/29/T-2 (2024) KONDAGAON 12.04.2024 | EST. FOR ADDITIONAL X-MER 25 KVA AT VILLAGE -ERLA POST-ERLA BLOCK - MAKADI UNDER BIJAPUR D/C. | 99038.00 | 02/05/2024 03:00PM | 02/05/2024 03:30PM | 63182 |
| 03:30PM | 03:00PM |
| |
13
| The EE(Project) Dn. Kondagaon | NO./EE/PROJECT/NIT/29/T-1 (2024) KONDAGAON 12.04.2024 | EST. FOR ADDITIONAL X-MER 25KVA AT VILLAGE -CHHINARI POST-CHHINARI BLOCK-MAKADI UNDER BIJAPUR D/C. | 236967.00 | 02/05/2024 03:00PM | 02/05/2024 03:30PM | 63181 |
| 03:30PM | 03:00PM |
| |
14
| The EE (Project) Dn Mahasamund | No./EE/Project/Tender/019 Dt. 09.04.2024 | Hiring of 1 No. Boloro/Jeep Category Vehicle for A.E. (Pro) Dn. Mahasamund O/o EE (Pro) Dn. CSPDCL, Mahasamund. | 670608.00 | 30/04/2024 03:00PM | 30/04/2024 04:00PM | 63177 |
| 04:00PM | 03:00PM |
| |
15
| The Chief Engineer (Project) | No. 02-08/Works/Tr No- 2385/7569 Raipur Dtd. 12.03.2024 | Installation of 2x5 MVA 33/11 KV semi indoor type substation for New Residential House for CM at sector- 24 Naya Raipur, 1 nos additional 33/11 KV 5 MVA transformer at Sector- 22 Naya Raipur and 1 nos additional 33/11 KV 5 MVA transformer at sector- 24. | 87187712 | 29/04/2024 03:00PM | 29/04/2024 03:30PM | 63156 |
| 03:30PM | 03:00PM |
| |
16
| EE(Project)Dn.CSPDCL Kawardha | T-471/23-24 | NIT for External Electrification of Police Thana Parisar S.Lohara under S.Lohara D/c. | 391292.00 | 28/04/2024 12:00PM | 28/04/2024 12:30PM | 63089 |
| 12:30PM | 12:00PM |
| |
17
| EE(Project)Dn.CSPDCL Kawardha | T-470/23-24 | NIT for Shifting of 11 KV Line at village Baijalpur under Raweli D/c. | 165195.00 | 28/04/2024 12:00PM | 28/04/2024 12:30PM | 63088 |
| 12:30PM | 12:00PM |
| |
18
| Executive Engineer Project Dn Rajnandgaon | EE/ PROJECT/RJN/ T-1597/2023-24 01.04.2024 | Estimate for shifting of existing 3Ph 5wire LT Line which is passes over to applicants premises at Village - Bundeli under Block Chhukadan under Bundeli D/c of (O&M) Dn., Khairagarh. & Estimate for shifting of existing 3Ph 5wire LT Line which is passes over to new proposed Bridge for Udaypur-Aamaghatkada Road (Limati Nala) at Village - Aamaghatkada under udaypur D/c of (O&M) Dn., Khairagarh. (The S.D.O. PWD Bridge Construction Sub Division, Rajnandgaon. & Estimate for shifting of existing 33 KV Line (Chhuikhadan at Chhuikhadan (Ward No. 01) under Chhuikhadan D/c of (O&M) Dn., Khairagarh. | 324103.00 | 22/04/2024 12:30PM | 22/04/2024 01:30PM | 62958 |
| 01:30PM | 12:30PM |
| |
19
| EE(Project)Dn.CSPDCL Kawardha | T-469/23-24 | Estimate for height raising of existing 11kv line of chhirpani feeder deu to elephant movement reported at village Malkachara under Kapadah DC of O & M Dn Pandariya. | 246010.00 | 16/04/2024 12:00PM | 16/04/2024 12:30PM | 62905 |
| 12:30PM | 12:00PM |
| |
20
| Executive Engineer Project Dn Rajnandgaon | EE/ PROJECT/RJN/ T-1596/24 Dt. 21.03.24 | Estimate of Replacement of 3.15 MVA 33/11 KV Power Transformer Faild Within Guarantee Period Installed at 33/11 KV S/stn. Sewatapara Dongargaon under Dongargaon (Town) D/c of (O&M) Dn., Dongargaon. | 152149.00 | 10/04/2024 12:30PM | 10/04/2024 01:30PM | 62836 |
| 01:30PM | 12:30PM |
| |
21
| The Chief Engineer (Project) | No.02-08/CW/2023-24/Tr No.-2388/7716 Raipur Dt- 15.03.2024 | Extension of 33 KV line and installation of 01 no. 3.15 MVA 33/11KV power Sub station at village - Narkalo- Navapara block Lakhanpur under Lakhanpur D/c under O&M Dn Ambikapur. | 13016259.00 | 12/04/2024 12:00PM | 12/04/2024 12:05PM | 62764 |
| 12:05PM | 12:00PM |
| Rfx-8100036724 |
22
| The Chief Engineer (Project) | No.02-08/CW/2023-24/Tr No.-2387/7716 Raipur Dt- 15.03.2024 | Shifting of 33kv SECL feeder for SECL BAROUD at village Baroud under Kudumkela D/C of o&m dn-1 Raigarh. | 2869601.00 | 12/04/2024 12:00PM | 12/04/2024 12:05PM | 62763 |
| 12:05PM | 12:00PM |
| Rfx-8100036723 |
23
| The Chief Engineer (Project) | No.02-08/CW/2023-24/Tr No.-2386/7716 Raipur Dt- 15.03.2024 | External Electrification of Residential Colony "Wallfort Greens" load of 2849 KW at village - Kopedih & Mahuda under Amleshwar D/C of O&M Dn. Bhilai. | 3070795.00 | 12/04/2024 12:00PM | 12/04/2024 12:05PM | 62762 |
| 12:05PM | 12:00PM |
| Rfx-8100036722 |
24
| Executive Engineer Project Dn Rajnandgaon | EE/ PROJECT/RJN/ T-1595/24 Dt. 15.03.24 | Estimate for Replacement of 11 KV PCC Pole Broken for Shri Birendra Sahu at Village - Machanpar under Tumdibod D/c of (O&M) Dn., Rajnandgaon & Estimate for Shifting of 11 KV Line for Shri Mohd. Firoz Rathore at Village - Tappa under Tumdibod D/c of (O&M) Dn., Rajnandgaon. | 172312.00 | 05/04/2024 12:30PM | 05/04/2024 01:30PM | 62761 |
| 01:30PM | 12:30PM |
| |
25
| The EE(Project) Dn. Kondagaon | NO./EE/PROJECT/NIT/2494/T-695 KONDAGAON 14.03.2024 | EST. FOR P/S TO 03 NO. 09 HP TW CONNECTION TO SHRI ASHOK YADAV S/O & 02 NO. VARIOUS CONSUMER AT VILLAGE - KUNDLA UNDER NARAYANPUR (R) D/C. | 177991.00 | 05/04/2024 03:00PM | 05/04/2024 03:30PM | 62729 |
| 03:30PM | 03:00PM |
| |
26
| The EE(Project) Dn. Kondagaon | NO./EE/PROJECT/NIT/2494/T-695 KONDAGAON 14.03.2024 | ESTIMATE FOR SHIFTING OF LT OF THE PRINCIPAL EKLAVYA SCHOOL GOLAWAND AT VILLAGE -GOLAWAND MARDAPAL D/C, | 49881.00 | 05/04/2024 03:00PM | 05/04/2024 03:30PM | 62728 |
| 03:30PM | 03:00PM |
| |
27
| EE(Project) Baikunthpur | EE/(PROJECT)/BKP/WK/23-24/ T - 335/1451 Dt. 15.03.2024 | Tender for Additional 63 KVA X-mer At Vill. - Jamdai Uranwpara u/n Patna DC u/n (O&M) Dn Baikunthpur | 236553 | 04/04/2024 03:00PM | 04/04/2024 03:30PM | 62727 |
| 03:30PM | 03:00PM |
| |
28
| The E.E.(Project),Kanker | EE/PRO/KNK/NIT-2087 T-511 DT. 15.03.2024 | Estimate for interconnection of 11 KV line from Kulli to Pratappur Under Mathura Bazar D/c in Sub. Dn Pjore-2 of (O&M) Dn. Pakhanjore. | 416621 | 04/04/2024 03:00PM | 04/04/2024 03:30PM | 62719 |
| 03:30PM | 03:00PM |
| |
29
| The E.E.(Project),Kanker | EE/PRO/KNK/NIT-2086 T-510 DT. 15.03.2024 | Estimate for Feeder Bifercation of 11 KV Devda feeder of 33/11 KV S/s Mathura Bazar Under Mathura Bazar D/c in Sub. Dn Pjore-2 of (O&M) Dn. Pakhanjore. | 422161 | 04/04/2024 03:00PM | 04/04/2024 03:30PM | 62718 |
| 03:30PM | 03:00PM |
| |
30
| The E.E.(Project),Kanker | EE/PRO/KNK/NIT-2085 T-509 DT 15.03.2024 | Estimate for Interconnection of 11 KV Line from at Village - PV-19 to PV -127 Under Pakhanjore D/c in Sub. Dn Pjore-1 of (O&M) Dn. Pakhanjore. | 374523 | 04/04/2024 03:00PM | 04/04/2024 03:30PM | 62717 |
| 03:30PM | 03:00PM |
| |
31
| The E.E.(Project),Kanker | EE/PRO/KNK/NIT-2085 T-508 DT. 15.03.2024 | Estimate for providing 01 No 25 KVA Addl Xmer in order to aboid low voltage problem at Village - PV-51 Under Pakhanjore D/c in Sub. Dn Pjore-1 of (O&M) Dn. Pakhanjore. | 205622 | 04/04/2024 03:00PM | 04/04/2024 03:30PM | 62716 |
| 03:30PM | 03:00PM |
| |
32
| The E.E.(Project),Kanker | EE/PRO/KNK/NIT-2083 T-507 DT. 15.03.2024 | Estimate for providing 01 No 25 KVA Addl Xmer in order to aboid low voltage problem at Village - PV-20 Under Pakhanjore D/c in Sub. Dn Pjore-1 of (O&M) Dn. Pakhanjore. | 340330 | 04/04/2024 03:00PM | 04/04/2024 03:30PM | 62715 |
| 03:30PM | 03:00PM |
| |
33
| The E.E.(Project),Kanker | EE/PRO/KNK/NIT-2082 T-506 DT. 15.03.2024 | Estimate for providing 01 No 25 KVA Addl Xmer in order to aboid low voltage problem at Village - PV-117 Under Mathura Bazar D/c in Sub. Dn Pjore-2 of (O&M) Dn. Pakhanjore. | 266317 | 04/04/2024 03:00PM | 04/04/2024 03:30PM | 62714 |
| 03:30PM | 03:00PM |
| |
34
| The E.E.(Project),Kanker | EE/PRO/KNK/NIT-2081 T-505 DT. 15.03.2024 | Estimate for interlinking of Devda to Esebeda Feeder Under Mathura Bazar D/c in Sub. Dn Pjore-2 of (O&M) Dn. Pakhanjore. | 350716 | 04/04/2024 03:00PM | 04/04/2024 03:30PM | 62713 |
| 03:30PM | 03:00PM |
| |
35
| The E.E.(Project),Kanker | EE/PRO/KNK/NIT-2080 T-504 DT. 15.03.2024 | Estimate for providing 01 No 25 KVA Addl Xmer in order to aboid low voltage problem at Village - PV-01 Under Kapsi D/c in Sub. Dn Pjore-1 of (O&M) Dn. Pakhanjore. | 306290.00 | 04/04/2024 03:00PM | 04/04/2024 03:30PM | 62712 |
| 03:30PM | 03:00PM |
| |
36
| The E.E.(Project),Kanker | EE/PRO/KNK/NIT-2079 T-503 DT. 15.03.2024 | Estimate for providing 01 No 25 KVA Addl Xmer in order to aboid low voltage problem at Village - PV-123 Under Mathura Bazar D/c in Sub. Dn Pjore-2 of (O&M) Dn. Pakhanjore. | 279642.00 | 04/04/2024 03:00PM | 04/04/2024 03:30PM | 62711 |
| 03:30PM | 03:00PM |
| |
37
| EE(Project) Dn., Jashpur | E.E./Proj./2023-24/NIT-29/170/905 ,Jashpur , Date :- 15.03.2024 | Estimate for 33 VCB installation & 33KV DP In Bandarchuwa S/S for Kunkuri subdivision under O&M Dn. Jashpur. | 399072.00 | 04/04/2024 03:00PM | 04/04/2024 03:30PM | 62678 |
| 03:30PM | 03:00PM |
| |
38
| EE(Project) Dn., Jashpur | E.E./Proj./2023-24/NIT-29/169/905 ,Jashpur , Date :- 15.03.2024 | Estimate for 33 KV ADDITIONAL BAY, 33KV DP In Bandarchuwa S/S for Kunkuri subdivision under O&M Dn. Jashpur. | 317708.00 | 04/04/2024 03:00PM | 04/04/2024 03:30PM | 62677 |
| 03:30PM | 03:00PM |
| |
39
| EE(Project) Dn., Jashpur | E.E./Proj./2023-24/NIT-29/168/905 ,Jashpur , Date :- 15.03.2024 | Estimate for P/S to 01 nos 01X3HP HP Irri. PUMP connection at Vill - GODHI B under KOTBA D/C. | 86810.00 | 04/04/2024 03:00PM | 04/04/2024 03:30PM | 62676 |
| 03:30PM | 03:00PM |
| |
40
| EE(Project) Dn., Jashpur | E.E./Proj./2023-24/NIT-29/167/905 ,Jashpur , Date :- 15.03.2024 | Estimate for 6 no. 11 KV AB SWITCH of 33/11 KV substation KANSABEL (all feeder) under KANSABEL D/C & Estimate for 4 no. 11 KV AB SWITCH of 33/11 KV substation jamjhore (all feeder) under KOTBA D/C of 0&M division PATHALGAON . | 111463.00 | 04/04/2024 03:00PM | 04/04/2024 03:30PM | 62675 |
| 03:30PM | 03:00PM |
| |
41
| EE(Project) Dn., Jashpur | E.E./Proj./2023-24/NIT-29/166/905 ,Jashpur , Date :- 15.03.2024 | Estimate for replacement of 3 ph ab cable stolen by unknown thieves at vill kachuwakani sisringa under FARSABAHAR D/C & Estimate for replacement of 0.550 KM LT 3PH4W AB Cable at village CHIKNIPANI under KOTBA D/C UNDER O&M DIV PATHALGAON. | 134447.00 | 04/04/2024 03:00PM | 04/04/2024 03:30PM | 62674 |
| 03:30PM | 03:00PM |
| |
42
| EE(Project) Dn., Jashpur | E.E./Proj./2023-24/NIT-29/165/905 ,Jashpur , Date :- 15.03.2024 | Estimate for ADDITIONAL XMER TO AVOID LOW VOLTAGE AT VILAAGE- SAGIBHAWNA URAWTOLI) Under KANSABEL DC OF O&M Dn. Pathalgaon. | 303846.00 | 04/04/2024 03:00PM | 04/04/2024 03:30PM | 62673 |
| 03:30PM | 03:00PM |
| |
43
| EE(Project) Dn., Jashpur | E.E./Proj./2023-24/NIT-29/164/905 ,Jashpur , Date :- 15.03.2024 | Estimate for ADDITIONAL XMER TO AVOID LOW VOLTAGE AT VILAAGE- KHARPANI Under KANSABEL DC OF O&M Dn. Pathalgaon. | 132944.00 | 04/04/2024 03:00PM | 04/04/2024 03:30PM | 62672 |
| 03:30PM | 03:00PM |
| |
44
| EE(Project) Dn., Jashpur | E.E./Proj./2023-24/NIT-29/163/905 ,Jashpur , Date :- 15.03.2024 | Estimate for proposed A.B. switch on 11 kv line at diffirent location under Jashpur sub division under o&m div jashpur. | 308512.00 | 04/04/2024 03:00PM | 04/04/2024 03:30PM | 62671 |
| 03:30PM | 03:00PM |
| |
45
| The EE (Project) Dn Mahasamund | EE/PRO/MSD/2023-24/NIT/No.050/T.No.740//15.03.2024 | Estt. For Installation of 01 No. 63 KVA Addl. Transformer at village Khusrupali Under Pithora (R) D/c of O&M Dn. Pithora under EE (Pro) Dn. Mahasamund. | 396973.00 | 04/04/2024 01:00PM | 04/04/2024 02:30PM | 62667 |
| 02:30PM | 01:00PM |
| |
46
| The EE (Project) Dn Mahasamund | EE/PRO/MSD/2023-24/NIT/No.050/T.No.739//15.03.2024 | Est. for Installation of 13 No. AB Switch with complete fitting for phase reversal of fully loaded various 11 KV feeder of varous 33/11 KV S/s under Bagbahara Sub.Dn. of O&M Dn. Mahasamund of EE (Project) Dn. Mahasamund | 254133.00 | 04/04/2024 01:00PM | 04/04/2024 02:30PM | 62666 |
| 02:30PM | 01:00PM |
| |
47
| The EE (Project) Dn Mahasamund | EE/PRO/MSD/2023-24/NIT/No.050/T.No.738/2523/15.03.2024 | Est. for Installation of 16 No. AB Switch with complete fitting for phase reversal of fully loaded various 11 KV feeder of varous 33/11 KV S/s under Bagbahara & Komakhan Sub.Dn. of O&M Dn. Mahasamund of EE (Project) Dn. Mahasamund | 284845.00 | 04/04/2024 01:00PM | 04/04/2024 02:30PM | 62665 |
| 02:30PM | 01:00PM |
| |
48
| The EE (Project) Dn Mahasamund | EE/PRO/MSD/2023-24/NIT/No.050/T.No.737/2523/15.03.2024 | Estt. For addl. 01 No. 63 KVA Xmer & 01 No. Aug 25 to 63 KVA at Village Dharampur & Bhurka Under Khatti & Mahasamund (R) D/c of O&M Dn. Mahasamund Under EE (Project) Dn. Mahasamund. | 352070.00 | 04/04/2024 01:00PM | 04/04/2024 02:30PM | 62664 |
| 02:30PM | 01:00PM |
| |
49
| The EE (Project) Dn Mahasamund | EE/PRO/MSD/2023-24/NIT/No.050/T.No.736/2523/15.03.2024 | Estt. For Aug. of 02 No. 10 KVA to 25 KVA at Village Lafinkala (Bhathapara) Under Mahasamund (R) D/c of O&M Dn. Mahasamund Under EE (Project) Dn. Mahasamund. | 319491.00 | 04/04/2024 01:00PM | 04/04/2024 02:30PM | 62662 |
| 02:30PM | 01:00PM |
| |
50
| The EE (Project) Dn Mahasamund | EE/PRO/MSD/2023-24/NIT/No.050/T.No.735/2523/15.03.2024 | Estt. For Aut. Of 01 No. 63 KVA to 100 KVA Xmer & LT Line Conv. 1 p3 W to 3p 5W addl. & Aug. of 01 No. 10 KVA to 25 KVA Xmer & LT Line Conv. 1p 2w to 3p 4w At village Bhilaidadar, Litiyadadar Under Komakhan D/c of O&M Dn. Mahasamund Under EE (Project) Dn. Mahasamund. | 219223.00 | 04/04/2024 01:00PM | 04/04/2024 02:30PM | 62661 |
| 02:30PM | 01:00PM |
| |
|